Skip to content

Angular redesign of the whole UI #1360

Done
28 of 28 issues completed
Done

Description

@smart-ssh-planner

Goal

The whole app gets the "Angular" redesign: square, sharp-edged components (radius 0), a graphite/cyan palette for dark and light, a flat icon set instead of emoji icons, and the new "Trace" logo — on desktop and narrow screens.

Scope

  • In: tokens and shared UI primitives, icon set, logo and app icons, every view (title bar and tabs, session header, server trees, mobile navigation, terminal and key row, chat, file browser, filter rules, settings, server form, activity center, startup/unlock, dialogs), plus a few small functional additions decided for the redesign (navigation always in the title bar, "+" for a new session, settings as a full window, collapsible command output, server name in the host key dialog, merged narrow session header).
  • Out (separate decisions later): a server sidebar next to an open session, hiding/rearranging the AI pane, a detail panel in the file browser, readable hard-blacklist summaries, per-category values in narrow settings.

Shared decisions

  • Reference: docs/design/angular/ — README.md, tokens.md, screens/<Artboard>.png|.html, icons/*.svg, logo/. PNG shows the look, HTML has the exact CSS values.
  • Token names stay those of src/theme/dark.css / light.css (THEMING.md); only values change. Components use the primitives from the foundation issue and the Icon component; no hand-written radius, shadow or colour values (colour guard test).
  • Fonts stay Barlow, Barlow Condensed, JetBrains Mono; labels uppercase Barlow Condensed.
  • Behaviour defined in specs stays unless an issue says "decided by maintainer"; where the design and a spec disagree on behaviour (e.g. host key button order, rule grouping by scope), the spec wins and only the look changes.
  • Order: foundation → icons → logo → views, as chained by "blocked by"; the confirmation card itself is built in the new look by Confirmation dialog: expand each sub-command to stage an allow rule, save rules separately #1357.

Sub-issues

Sub-issues

Sub-issues

28 of 28 Issues completed
Loading 28 sub-issues

Activity

  1. added this to the 0.8.0 milestone on Nov 19, 2026
  2. added
    enhancement
    frontend
    epic
    on Nov 19, 2026
  3. 5 remaining items

  4. smart-ssh-maintainer commented on Nov 24, 2026

    @smart-ssh-maintainer
    Contributor

    All sub-issues are done, closing the epic.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    enhancementepicfrontend

    Fields

    Priority

    None yet

    Projects

    No projects

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions