Repository navigation
Exit from the test runners when the suite ends; bump jolt-crypto to v0.0.10 - #33
Merged
Merged
Conversation
added 2 commits
October 2, 2026 08:17
jolt now waits for live non-daemon threads at exit, as the JVM does. The test servers accept in futures, and on Linux closing the listener does not wake a blocked accept, so the suite passed and then held the process until CI killed it. The runners now exit with the suite's status, like clojure test runners.
v0.0.10 stops falling back to Apple's libcrypto stub, which aborted the process on a Mac without OpenSSL instead of reporting the library missing, and declares :link-libs for static builds.
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
jolt now waits for live non-daemon threads before the process ends, as the JVM does (jolt-lang/jolt#1202). The test servers run their accept loops in futures, and on Linux closing the listener doesn't wake a blocked accept, so the suite passed and then held the process until the job timed out (jolt's nightly library row was cancelled at 30 min). On macOS it lingered 60s for the future pool.
The five -main runners now call System/exit with the suite's status instead of throwing on failure. Locally the main suite goes from 66s to 2.5s wall with a jolt main build; 97 tests, 289 assertions pass.
Second commit bumps jolt-crypto from v0.0.9 to v0.0.10, which stops falling back to Apple's libcrypto stub (it aborted the process on a Mac without OpenSSL) and declares :link-libs for static builds. Suite passes with it against jolt main.