Skip to content

docs: retire phases and milestones, and plan the vocabulary rulings and eight more records - #656

Merged
REPPL merged 2 commits into
mainfrom
docs/vocabulary-rulings
Sep 22, 2026
Merged

REPPL merged 2 commits into
mainfrom
docs/vocabulary-rulings

Conversation

@REPPL

@REPPL REPPL commented Sep 22, 2026

Copy link
Copy Markdown
Collaborator

What

The product thinker's evening interview of 2026-09-21, recorded where each ruling binds:

  • adr-2609212115255771 supersedes adr-9. Phases and milestones are retired, and the word roadmap with them: sequencing is dependencies plus the lifecycle shelves, rendered as a Now / Next / Later status block; the checkpoint is the derived release plus each intent's acceptance criteria; the unit below a spec is the step (a section, not a family); an issue carries no spec by design; the batch is the run's internal order. The glossary marks phase, milestone and roadmap superseded and gains bundle, step and the record-families page; the phase documents carry a retirement line; the ROADMAP rule domain is replaced by the decision's statement; itd-24 reads release for phase; itd-34 drops its phase rule.
  • Eleven intents planned and READY: the record-families map (itd-2609211913453478), the status block (itd-2609212103568351), steps (itd-2609212103565953), target_release (itd-2609212103572513), grouped help with an agents block behind --agent (itd-146, widened), the one-sentence explainer per verb (itd-2609212113220149), the verb consolidation (itd-2609212130136102, breaking), the guarded and reset status-line badge (itd-2609212130146198), one verb to a live site for a managed repository (itd-2609061543533170, written from its placeholder), doubles linked at filing (itd-2609212137116617), the product thinker / technical facilitator vocabulary (itd-2609212137129937; captured for the run, no sweep in this change), and abcd lab from the capstone's unfiled draft (itd-2609212137128014).
  • Two lab findings captured after verification at main (the guard payload's missing working directory; a banlist fragment shorter than a word), two found already fixed and noted.

Why

An independent research pass over the field found every surviving sequencing unit to be a timebox whose job is to carry a date, which this repository forbids, and every planned checkpoint beside derived releases collapsing into the release; it also found Now / Next / Later already present under the names planned/ and drafts/, so it is rendered here, never stored. The rest of the interview turned each question the product thinker raised into a record the autonomous run can build, one question at a time.

Review

Every record went through the readiness gate (all READY); the record, reviews-charter, decisions-append and docs gates and the full preflight pass. The decomposition is graded into the calibration note. Two records changed their first routing at the human's word (the status block was first offered as a roadmap bucket; the badge as event-derived).

Records

Refs: iss-2609212142557657, iss-2609212142568782, iss-2609170627427239, iss-2609170709035405, iss-2609020219265817

Assisted-by: Claude:claude-opus-5

…s and eight more records from the product thinker's interview

adr-2609212115255771 supersedes adr-9: sequencing is dependencies plus the
lifecycle shelves, rendered as a Now / Next / Later status block; the
checkpoint is the derived release plus each intent's criteria; the step is
the unit below a spec; issues carry no spec by design. The glossary marks
phase, milestone and roadmap superseded and gains bundle, step and the
record-families page; the phase documents carry a retirement line; the
ROADMAP rule domain is replaced by the decision's statement; itd-24 reads
release for phase; itd-34 drops its phase rule.

Planned and READY from the interview: the record-families map, the status
block, steps, target_release, itd-146 widened (an agents block behind
--agent), the one-sentence explainer per verb, the verb consolidation
(breaking), the guarded and reset status-line badge, one verb to a live
site for a managed repository, doubles linked at filing, the product
thinker / technical facilitator vocabulary (captured for the run, no sweep
today), and abcd lab from the capstone's draft. Two lab findings captured
after verification at main; two found already fixed.

Refs: iss-2609212142557657, iss-2609212142568782, iss-2609170627427239, iss-2609170709035405, iss-2609020219265817
Assisted-by: Claude:claude-opus-5
…d superseded entries

Assisted-by: Claude:claude-opus-5
@REPPL
REPPL enabled auto-merge September 22, 2026 09:46
@REPPL
REPPL added this pull request to the merge queue Sep 22, 2026
Merged via the queue into main with commit d1c03a8 Sep 22, 2026
12 checks passed
@REPPL
REPPL deleted the docs/vocabulary-rulings branch September 22, 2026 10:26
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant