Skip to content

docs: docs/ folder brought up to date for the 6.3 Tech Preview - #1119

Merged
dwolfson merged 5 commits into
mainfrom
claude/docs-6.3-sweep-signed
Nov 20, 2026
Merged

dwolfson merged 5 commits into
mainfrom
claude/docs-6.3-sweep-signed

Conversation

@dwolfson

Copy link
Copy Markdown
Owner

Brings everything under the top-level docs/ folder up to date for the Trellis 6.3 Tech Preview. Docs only: 31 files, +185/-49.

  • Reference docs fixed against the code:
    • deploying-trellis-with-quickstart.md: Studio (8840, emerging preview, STUDIO_JWT_TTL_MINUTES / STUDIO_SESSION_MAX_HOURS); trellis-up / make up start report; secrets files at 600; PGVECTOR_PASSWORD has no default; TR-62 step heartbeat, cancel and PREFECT_STEP_TIMEOUT_SECONDS (env-only, counts from dispatch).
    • demo-deployment-runbook.md: pyegeria floor 6.3.0, the knowledge-base check, corpus --phase all.
    • trellis-architecture.md: three apps and ten libraries.
    • packaging.md and portal-integration.md.
  • Design docs and plans: each has a one-line 6.3 status (implemented / partly / not built) at the top. History is not rewritten.
  • Archived: two stale dated notes moved to docs/archive/ with git mv; the one inbound link is updated.
  • New docs/README.md: indexes all 33 files as Reference / Design & history / Archive.

Not in this PR: the egeria-workspaces copy of the deploy guide (DEPLOYING-TRELLIS.md), and RE's own docs for the C1–C3 file-system survey, Publish and Curate work.

Signed-off-by: Dan Wolfson dan.wolfson@pdr-associates.com

🤖 Generated with Claude Code

Adds Trellis Studio (port 8840, native only, STUDIO_JWT_TTL_MINUTES and
STUDIO_SESSION_MAX_HOURS), trellis-up's start report, the TR-62 step
heartbeat, cancel and PREFECT_STEP_TIMEOUT_SECONDS, and EA's "knowledge
base not built" message. Corrects the Postgres password claim: there is
no default, PGVECTOR_PASSWORD is required.

Signed-off-by: Dan Wolfson <dan.wolfson@pdr-associates.com>
…s Studio and prefect-worker

trellis-architecture.md still described two apps and six libraries.
packaging.md gains a status line (Studio has no image) and the
prefect-worker entrypoint role.

Signed-off-by: Dan Wolfson <dan.wolfson@pdr-associates.com>
…ck, corpus build corrected

Signed-off-by: Dan Wolfson <dan.wolfson@pdr-associates.com>
…plans

Moves morning-brief-2026-08-31 and task-list-2026-08-28 to docs/archive/
(the one link, in the RE Backlog, is updated). Every other design doc,
plan, audit and brief gets a one-line 6.3 status: implemented, partly
implemented, not built, or historical. Portal integration notes that
Studio uses the same exchange.

Signed-off-by: Dan Wolfson <dan.wolfson@pdr-associates.com>
…istory and Archive

Signed-off-by: Dan Wolfson <dan.wolfson@pdr-associates.com>
@dwolfson
dwolfson merged commit 2478787 into main Nov 20, 2026
4 checks passed
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant