Skip to content

About

Website for the CLAMS project

Resources

Stars

2 stars

Watchers

3 watching

Forks

Latest commit

 

History

58 Commits

Folders and files

Repository files navigation

CLAMS Project Documentation Hub

This repository serves as the central publication hub for all documentation related to the CLAMS project. It aggregates generated HTML documentation from various source repositories and serves them from a single location.

Hosted Documentation

Project Path Versioned Source repo
Home / hub pages docs/home/ no this repo (documentation/)
clams-python docs/clams-python/ no clamsproject/clams-python
vocabulary docs/vocabulary/ no clamsproject/clams-vocabulary
mmif-python docs/mmif-python/ yes (docs/mmif-python/<version>/) clamsproject/mmif-python

Note

docs/vocabulary/ contains legacy version subdirectories (1.0.0–1.1.0) from when vocabulary was part of the MMIF specification. These are static historical snapshots, not generated by the current build system.

How It Works

Documentation source (.rst files, Python docstrings) lives in each project's repository. Each source repo has a publish.yml workflow that, upon release, calls the reusable sdk-docs.yml workflow in this repository. The workflow:

  1. Checks out the source repo at the release tag.
  2. Runs python3 build-tools/docs.py --build-ver <version> --output-dir _docs in the source repo.
  3. Copies the output into docs/<project-name>/ (or docs/<project-name>/<version>/ for versioned projects).
  4. Runs build-tools/inject-header.py to add the CLAMS hub navigation header across all projects.
  5. Commits and pushes to this repository.

This repository does not contain any documentation source files (except for the hub home pages), only the final, published HTML artifacts.

Building Documentation Locally

These instructions are for developers working on the documentation source files located in the documentation/ directory. documentation/ contains the source for the main hub pages (e.g., index, team, events) that's called "home" in the integerated publication pages.

Setup

pip install -r build-tools/requirements.home.txt

Build

From the repository root, you build the documentation using sphinx-build. This generates the raw HTML files.

python build-tools/home.py 

This will generate the HTML files in the docs/home directory. There's docs/index.html (the main landing page) that's simply redirected to docs/home/index.html.

After building, you can inject the consistent CLAMS hub header into the generated files. This is necessary for the docs to look correct when deployed. The --base-url should point to the root of where the docs will be served. For local viewing, you can use a relative path.

# Example for deployment
python build-tools/inject-header.py docs/home --base-url https://clams.ai

This will edit all html files in docs/home in-place.

View Locally

# Simple HTTP server
cd docs
python -m http.server 8000
# Then open http://localhost:8000 in your browser

About

Website for the CLAMS project

Resources

Stars

2 stars

Watchers

3 watching

Forks

Releases

Packages

Used by

Contributors

Languages