You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
{{ message }}
Repository navigation
views' timestamp loses tz info when run in HTTP or cli.py #312
When a view is generated via the regular annotate() wrapper (used in cli.py and HTTP ) , the "run ID" (#269 ) re-write the timestamp but without timezone information as fixed in clamsproject/mmif-python#368
Reproduction steps
Run any app uses (e.g., SWT v9) clams-python 1.4.0 (2025 Nov) -- 1.8.0 , and check the timestamp value in the view's metadata.
"timestamp": "2026-09-06T16:38:28.203289",
Expected behavior
the value should be Z part . The mmif-python side added this in 2026 Feb, but clams-python side somehow have implemented its own timestamping code and wasn't updates along with clamsproject/mmif-python#368.
Log output
Screenshots
No response
Additional context
Proper fix should be, instead of maintaining its own timestamping code in clams-python, capturing the timestamp from the first view of the current run and rewrite other following views (if any) with the first view's timestamp.
Activity