[roadmap] Q4 2026 Canvas and timeline: editing, UI and output parity / 画布与时间线功能和UI #262

Open
2 of 3 issues completed

Description

@wangtiance

Parent roadmap: #107. November–December 2026 targets; owners and capacity remain to be confirmed.

Goal and scope / 目标与范围

Deliver the editing and UI capabilities needed for reference-MV and product-film creation, with reliable save/reopen and preview/export parity. Verify and strengthen existing capabilities rather than treating every tracked feature as unimplemented.

围绕参考MV和商品短片补齐功能与UI,形成素材组织、编辑、时间线、导出和重开闭环;现有能力先核验加固,不重复作为从零新增。

Work and milestones / 工作与里程碑

  • By November 30 · P0: deliver editing essentials for the first reference-video film. Address large-project responsiveness, repeated undo/redo, reference prechecks, first/last-frame roles, asset provenance and archive round trips. Preserve focus, selection and uncommitted drafts during background updates.

  • By November 30 · P0: support the prompt optimization, candidate review/adoption and shot/timeline operations actually required by that film. Distinguish replacing source content from switching adopted results. Use shared commands and readable disabled/error states.

  • First half of December · P0/P1: complete caption/text acceptance and prioritize transitions, multiple visual tracks, position/scale/opacity keyframes and audio fades by demonstrated creation needs. Each feature needs an editable document, UI, Agent operation, preview and export.

  • By December 31 · P1: complete Director Stage creation, external character/scene import with motion binding, and publication as project assets. Build selected director-toolbox actions from working contracts. Depth-to-character motion requires its own validation; depth frames alone do not establish skeletal motion capture.

  • Advanced editing must not block the November first-film milestone unless that scenario actually requires it.

  • **11月底 · P0:**交付首条参考视频成片必需编辑能力,治理大工程性能、反复撤销/重做、引用预检、首尾帧、来源和归档往返;后台更新保留焦点、选中与草稿。

  • **11月底 · P0:**补齐该场景必要的提示词优化、候选检查/采用和镜头编排;区分替换本体与切换采用结果,操作走共用命令,禁用和失败原因可读。

  • **12月上半月 · P0/P1:**完成字幕文字验收;按真实需要依次推进转场、多视觉轨、位置/缩放/不透明度关键帧和音频淡化,均提供可编辑结构、UI、Agent入口、预览及导出。

  • **12月底 · P1:**打通导演台创建、角色/场景导入与动作绑定、素材发布,再形成必要导演工具箱动作;深度驱动角色单独验证,不能以逐帧深度代替骨骼动作能力。

  • 除非首条成片确实需要,高级能力不作为11月交付前置条件。

Tracked tasks / 跟踪任务

Implementation and dependencies / 实现影响与依赖

Use shared commands, asset registration and editing documents. Related implementation: #153, #154, #87, #241, #256, #117, #122, #121 and the supplemental requirements in #107. Coordinate actual generation capabilities with providers; provide required operations to the Agent roadmap.

沿用共享命令、素材登记和编辑文档,已有 Issue 继续承接;provider提供真实生成能力,Agent复用本领域操作。

Acceptance / 验收标准

  • Matched before/after measurements on the same representative large project and environment; repeated history operations and background completion preserve state. / 同规模同环境测量,历史操作与后台完成不丢数据。
  • Delivered operations have equivalent UI/Agent entry points and complete zh-CN/en-US interactions. / 双入口及中英文完整。
  • Save/reopen and editable archive round trips preserve assets, fonts, timing and relationships. / 保存重开及归档往返保留素材、字体、时序和关系。
  • Real MP4 output matches preview in pictures, captions, audio and timing. / 真实MP4画面字幕音频时序与预览一致。
  • Director Stage output becomes a registered project asset usable on the timeline. / 导演台结果登记为可被时间线引用的项目素材。

Activity

  1. added
    type:metaProcess, labels, roadmap and repository hygiene
    area:canvasCanvas, nodes and direct manipulation
    area:timelineTimeline, subtitles and export
    on Nov 10, 2026
  2. MrDongsls commented on Nov 16, 2026

    @MrDongsls
    Contributor

    I'm taking the December 31 P1 Director Stage milestone. #328–331 cover stage creation, GLB/GLTF import with animation binding, output asset registration, and agent publishing. Depth-driven character motion and further director-toolbox actions remain open and will be planned as separate work.

  3. wangtiance commented on Nov 16, 2026

    @wangtiance
    CollaboratorAuthor

    I'm taking the December 31 P1 Director Stage milestone. #328–331 cover stage creation, GLB/GLTF import with animation binding, output asset registration, and agent publishing. Depth-driven character motion and further director-toolbox actions remain open and will be planned as separate work.

    Great. Added you as assignee. Thanks for contributing!

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

Labels

area:canvasCanvas, nodes and direct manipulationarea:timelineTimeline, subtitles and exporttype:metaProcess, labels, roadmap and repository hygiene

Type

No type

Projects

No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions