Pin merged Jig and PAA contracts revisions - #2
Conversation
|
No actionable comments were generated in the recent review. 🎉 ℹ️ Recent review info⚙️ Run configurationConfiguration used: defaults Review profile: CHILL Plan: Essentials Run ID: ⛔ Files ignored due to path filters (1)
📒 Files selected for processing (1)
Included review availability: 1 review is currently available. Your included PR review attempts over the past 7 days set your current allowance at 4 reviews per hour. 📝 WalkthroughWalkthroughThe project configuration updates the pinned Git revisions for the ChangesDependency Revision Updates
Priority: ⬇️ Low Estimated code review effort: 1 (Trivial) | ~2 minutes Merge Risk: ⚪ Minimal · up to The dependency updates are synchronized and validated, with no remaining merge-blocking risk identified. 🚥 Pre-merge checks | ✅ 5✅ Passed checks (5 passed)
✨ Finishing Touches🧪 Generate unit tests (beta)
Comment |
Summary
5932f7237a369fe705512915ef4033da0ca27c74, the merged revision from Return typed grading and feedback outcomes through Result pipelines jig#90.1e054d02a36d1da832e8a1c9cf10974131b09f5d, the merged revision from Add native numeric evidence and Assay companion conformance paa#13.uv.lockwithout changing any unrelated dependencies.This is the dependency-integration follow-up to #1. It does not add the production DRY worker adapter or authorize a paid experiment.
Validation
git diff --checkpassed.Summary by CodeRabbit