You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
{{ message }}
Repository navigation
P0: preflight deployed runtime targets before shared dependency rollout #406
A shared-runtime dependency rollout can be source-compatible while an older deployed service still references a strategy profile that is no longer admitted by the canonical catalog. The container then fails closed at startup.
Required guard
Before an image rollout, resolve every targeted Cloud Run runtime target against the pinned catalog and adapter capability matrix.
Require STRATEGY_PROFILE and runtime-target profile to agree, and require the target mode/dry-run flags to meet the declared deployment policy.
Fail the deployment before traffic shifts if any target is retired, unsupported, or has a name/mode mismatch.
Do not silently remap a retired strategy to another strategy; it needs a separate release/admission decision.
Keep the verification generic for every strategy, plugin mount, and platform target.
Acceptance evidence
Unit coverage for a retired profile and for profile/mode mismatch.
Deploy workflow preflight executes before image build/traffic shift.
A current-target audit report contains only non-sensitive identity/status fields.
Audit evidence: the readonly Gateway capability is merged in #405. A scoped shadow rollout was prevented from continuing because the deployed legacy profile is not admitted by the current canonical catalog; the target was disabled and its shadow schedulers paused. This confirms the guard must be a pre-traffic deployment check, not a silent compatibility fallback.
Implemented and merged in #407. Standard image rollouts now verify the deployed target against the pinned catalog before traffic shifts, and deployment cleanup is opt-in so rollback artifacts remain available.
Closing as completed: PR #407 merged with passing test coverage, pre-traffic target admission in the rollout workflow, and a non-sensitive audit report. The scoped runtime remains fail-closed when a deployed profile is not admitted; no silent remapping was introduced.
Activity
Pigbibi commentedon Aug 28, 2026
Audit evidence: the readonly Gateway capability is merged in #405. A scoped shadow rollout was prevented from continuing because the deployed legacy profile is not admitted by the current canonical catalog; the target was disabled and its shadow schedulers paused. This confirms the guard must be a pre-traffic deployment check, not a silent compatibility fallback.
Pigbibi commentedon Aug 28, 2026
Implemented and merged in #407. Standard image rollouts now verify the deployed target against the pinned catalog before traffic shifts, and deployment cleanup is opt-in so rollback artifacts remain available.
Pigbibi commentedon Aug 29, 2026
Closing as completed: PR #407 merged with passing test coverage, pre-traffic target admission in the rollout workflow, and a non-sensitive audit report. The scoped runtime remains fail-closed when a deployed profile is not admitted; no silent remapping was introduced.