You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
{{ message }}
Repository navigation
Monthly donations A: notify active plan donors when the receiving account is replaced #291
The monthly donations design (§4.3, plan A) says active plan donors must be told when a campaign's receiving account is replaced (#55). #275/#276 left this out of scope. Without it, a donor with a monthly plan keeps a reminder that shows the new account only from the next issue, with no notice that the bank account changed, which looks like a scam risk.
Scope
When a receiving-account swap (Replace a disabled receiving account on a live give campaign #55 flow) completes on a campaign with active donation plans, enqueue one notice per active plan donor through give.outbox_enqueue (trigger-side, like the other kinds).
Notice states the new account holder name, bank and last digits, the date of the change, and links to the campaign page; it does not ask the donor to transfer.
Respect the plan stop link and the email suppression table; no notice for stopped plans.
A maximum age for the kind, so a delayed send never goes out stale.
Done when
DOS.Me migration + Give template and copy, with tests for: swap with 0, 1, many active plans; stopped plan; donor deleted.
Fresh-context review, then PO second review (line:money).
checkpoint: session=da74074e-7c33-44cc-a408-d5a54ab9e2ec
Phase 1 DB PR https://github.com/DOS/DOS.Me/pull/1871 ready for PO flagship security review & acceptance at head cfe64f85abc858eee1e319eb3f7bf68ad3f29123:
Migration: supabase/migrations/20261130130000_give_plan_account_swap_notice.sql (strictly newer than #27320261130110000 and #7720261130120000; preserves #273claim_outbox changes).
pgTAP suite: supabase/tests/database/give_plan_account_swap_notice.test.sql (53/53 pass; all 50 Give suites green).
Required CI checks (4/4): Give pgTAP tests (dev), Supabase migration replay (dev), Repository integrity, Validate pnpm lockfile all green.
Reviews on final head cfe64f85abc858eee1e319eb3f7bf68ad3f29123: dos automated review APPROVED (CLEAN_PASS) + fresh-context flagship security subagent CLEAN_PASS; gemini-code-assist thread addressed (~*) and resolved.
Next: awaiting PO second review & acceptance before merging Phase 1 and starting Phase 2 (DOS/Give template & copy).
Cleaned up DOS.Me worktree and local branch.
Next: proceeding with Phase 2 (DOS/Give email template, Vietnamese copy, admin labels, and unit tests on branch antigravity/give-291-plan-swap-notice).
checkpoint: session=da74074e-7c33-44cc-a408-d5a54ab9e2ec
Phase 2 app PR #307 ready for PO flagship money-domain review & acceptance at head 7481687cdcaa99376746cb23d72d2faa10d47f75:
checkpoint: session=da74074e-7c33-44cc-a408-d5a54ab9e2ec
Phase 1 + Phase 2 merged to dev and verified on Beta:
Phase 1 DB (DOS/DOS.Me#1871, 20261130130000_give_plan_account_swap_notice.sql): squashed into DOS/DOS.Medev at 4dd78004d9d511a7624d7b977cc40f0730034b93; Supabase Preview (Beta) = success.
Phase 2 App (DOS/Give#307, plan_account_swapped template/copy/admin labels/tests): squashed into DOS/Givedev at 98d95583aacec285c4dbcd54cbcc1cc7e374fb0a; Verceldev/Beta (https://beta.give.vn) = success (https://vercel.com/metados/give/DMukkvw2UWwDcQjp38kMV6y6e85s).
Both worktrees and local branches removed cleanly.
Issue kept OPEN pending Production (dev -> main) promotion.
handoff: session=da74074e-7c33-44cc-a408-d5a54ab9e2ec to=83b36fa6-8c08-49d6-aeec-63bab02a5e52
Done: Phase 1 DB migration (DOS/DOS.Me#1871, 20261130130000_give_plan_account_swap_notice.sql + 53 pgTAP tests) merged into DOS/DOS.Medev at 4dd78004d9d511a7624d7b977cc40f0730034b93; Phase 2 app template, Vietnamese copy, admin outbox labels & unit tests (DOS/Give#307) merged into DOS/Givedev at 98d95583aacec285c4dbcd54cbcc1cc7e374fb0a.
Evidence: DOS.Me required CI (4/4: Give pgTAP tests 50 suites including 53/53 new assertions, Supabase migration replay, Repository integrity, Validate pnpm lockfile), dos APPROVED, fresh-context flagship security review CLEAN_PASS, PO acceptance, and Supabase Preview (Beta) = success. Give local (pnpm test 180/180 files 2629/2629 tests, lint, typecheck, format:check, build) + CI (Lint, Build all apps, DOScout, Vercel), dos APPROVED, fresh-context review CLEAN_PASS, PO acceptance, and Verceldev/Beta (https://beta.give.vn, https://vercel.com/metados/give/DMukkvw2UWwDcQjp38kMV6y6e85s) = success.
Remaining: Production promotion (DOS/DOS.Medev -> main first, then DOS/Givedev -> main) after owner approval, followed by Production verification and done: / close.
Next step: Include DOS/DOS.Me#1871 (4dd78004d9d511a7624d7b977cc40f0730034b93) and DOS/Give#307 (98d95583aacec285c4dbcd54cbcc1cc7e374fb0a) in the next PO-led Production promotion batch.
Blockers: none (awaiting Production promotion window / owner approval).
Branch: merged and cleaned up (DOS/DOS.Medev at 4dd78004d9d511a7624d7b977cc40f0730034b93, DOS/Givedev at 98d95583aacec285c4dbcd54cbcc1cc7e374fb0a; local worktrees and branches removed).
checkpoint: session=83b36fa6-8c08-49d6-aeec-63bab02a5e52 waiting for next Production promotion (dev -> main after JOY approval); Phase 1 DOS/DOS.Me#1871 merged at 4dd78004d9d511a7624d7b977cc40f0730034b93 (Supabase Preview Beta success) and Phase 2 #307 merged at 98d9558 (Vercel https://beta.give.vn success).
Activity
JOY commentedon Nov 22, 2026
claim: executor=Antigravity session=da74074e-7c33-44cc-a408-d5a54ab9e2ec scope="DOS/DOS.Me + DOS/Give #291 notify active plan donors on receiving-account swap" branch=antigravity/give-291-plan-swap-notice target=2026-11-23
JOY commentedon Nov 22, 2026
checkpoint: session=da74074e-7c33-44cc-a408-d5a54ab9e2ec
Phase 1 DB PR opened: https://github.com/DOS/DOS.Me/pull/1871 (branch antigravity/give-291-plan-swap-notice, head 7ed2a3d36).
Next: waiting for DOS/DOS.Me required CI checks (Give pgTAP tests, Supabase migration replay, Repository integrity, Validate pnpm lockfile) and running fresh-context flagship security review.
JOY commentedon Nov 22, 2026
checkpoint: session=da74074e-7c33-44cc-a408-d5a54ab9e2ec
Phase 1 DB PR https://github.com/DOS/DOS.Me/pull/1871 ready for PO flagship security review & acceptance at head
cfe64f85abc858eee1e319eb3f7bf68ad3f29123:supabase/migrations/20261130130000_give_plan_account_swap_notice.sql(strictly newer than#27320261130110000and#7720261130120000; preserves#273claim_outboxchanges).supabase/tests/database/give_plan_account_swap_notice.test.sql(53/53 pass; all 50 Give suites green).Give pgTAP tests (dev),Supabase migration replay (dev),Repository integrity,Validate pnpm lockfileall green.cfe64f85abc858eee1e319eb3f7bf68ad3f29123:dosautomated reviewAPPROVED (CLEAN_PASS)+ fresh-context flagship security subagentCLEAN_PASS;gemini-code-assistthread addressed (~*) and resolved.Next: awaiting PO second review & acceptance before merging Phase 1 and starting Phase 2 (
DOS/Givetemplate & copy).JOY commentedon Nov 22, 2026
PO acceptance: merge at cfe64f85abc858eee1e319eb3f7bf68ad3f29123 (DOS/DOS.Me#1871 -> dev)
JOY commentedon Nov 22, 2026
checkpoint: session=da74074e-7c33-44cc-a408-d5a54ab9e2ec
Phase 1 merged & deployed to Beta:
DOS/DOS.Me#1871squashed intodevat4dd78004d9d511a7624d7b977cc40f0730034b93.Supabase Preview(Beta):success(migration20261130130000_give_plan_account_swap_notice.sqlapplied cleanly).DOS.Meworktree and local branch.Next: proceeding with Phase 2 (
DOS/Giveemail template, Vietnamese copy, admin labels, and unit tests on branchantigravity/give-291-plan-swap-notice).JOY commentedon Nov 22, 2026
checkpoint: session=da74074e-7c33-44cc-a408-d5a54ab9e2ec
Phase 2 app PR #307 ready for PO flagship money-domain review & acceptance at head
7481687cdcaa99376746cb23d72d2faa10d47f75:apps/web/src/lib/email-outbox.ts,apps/web/src/lib/email-outbox.test.ts,apps/web/src/server/email/templates.ts,apps/web/src/server/email/templates.test.ts,apps/web/src/server/email/outbox.test.ts.pnpm test(180/180 files, 2629/2629 tests),pnpm lint,pnpm typecheck,pnpm format:check,pnpm buildall green.Lint✅,Build all apps✅,DOScout✅,Vercel✅.7481687cdcaa99376746cb23d72d2faa10d47f75:dosautomated reviewAPPROVED (CLEAN_PASS)+ fresh-context independent reviewerCLEAN_PASS.In review.Next: awaiting PO second review & acceptance before squash-merging into
dev.feat(email): add plan_account_swapped template, copy and admin labels…
JOY commentedon Nov 22, 2026
checkpoint: session=da74074e-7c33-44cc-a408-d5a54ab9e2ec
Phase 1 + Phase 2 merged to
devand verified on Beta:DOS/DOS.Me#1871,20261130130000_give_plan_account_swap_notice.sql): squashed intoDOS/DOS.Medevat4dd78004d9d511a7624d7b977cc40f0730034b93;Supabase Preview(Beta) =success.DOS/Give#307,plan_account_swappedtemplate/copy/admin labels/tests): squashed intoDOS/Givedevat98d95583aacec285c4dbcd54cbcc1cc7e374fb0a;Verceldev/Beta (https://beta.give.vn) =success(https://vercel.com/metados/give/DMukkvw2UWwDcQjp38kMV6y6e85s).Issue kept OPEN pending Production (
dev->main) promotion.JOY commentedon Nov 22, 2026
handoff: session=da74074e-7c33-44cc-a408-d5a54ab9e2ec to=83b36fa6-8c08-49d6-aeec-63bab02a5e52
Done: Phase 1 DB migration (
DOS/DOS.Me#1871,20261130130000_give_plan_account_swap_notice.sql+ 53 pgTAP tests) merged intoDOS/DOS.Medevat4dd78004d9d511a7624d7b977cc40f0730034b93; Phase 2 app template, Vietnamese copy, admin outbox labels & unit tests (DOS/Give#307) merged intoDOS/Givedevat98d95583aacec285c4dbcd54cbcc1cc7e374fb0a.Evidence: DOS.Me required CI (4/4: Give pgTAP tests 50 suites including 53/53 new assertions, Supabase migration replay, Repository integrity, Validate pnpm lockfile),
dosAPPROVED, fresh-context flagship security reviewCLEAN_PASS, PO acceptance, andSupabase Preview(Beta) =success. Give local (pnpm test180/180 files 2629/2629 tests,lint,typecheck,format:check,build) + CI (Lint,Build all apps,DOScout,Vercel),dosAPPROVED, fresh-context reviewCLEAN_PASS, PO acceptance, andVerceldev/Beta (https://beta.give.vn,https://vercel.com/metados/give/DMukkvw2UWwDcQjp38kMV6y6e85s) =success.Remaining: Production promotion (
DOS/DOS.Medev->mainfirst, thenDOS/Givedev->main) after owner approval, followed by Production verification anddone:/ close.Next step: Include
DOS/DOS.Me#1871(4dd78004d9d511a7624d7b977cc40f0730034b93) andDOS/Give#307(98d95583aacec285c4dbcd54cbcc1cc7e374fb0a) in the next PO-led Production promotion batch.Blockers: none (awaiting Production promotion window / owner approval).
Branch: merged and cleaned up (
DOS/DOS.Medevat4dd78004d9d511a7624d7b977cc40f0730034b93,DOS/Givedevat98d95583aacec285c4dbcd54cbcc1cc7e374fb0a; local worktrees and branches removed).JOY commentedon Nov 22, 2026
claim: executor=Antigravity session=83b36fa6-8c08-49d6-aeec-63bab02a5e52 scope="Production steps, waiting for next Production promotion (DOS/DOS.Me#1871 + #307 -> main)" branch=antigravity/give-291-plan-swap-notice target=2026-11-29
JOY commentedon Nov 22, 2026
checkpoint: session=83b36fa6-8c08-49d6-aeec-63bab02a5e52 waiting for next Production promotion (dev -> main after JOY approval); Phase 1 DOS/DOS.Me#1871 merged at 4dd78004d9d511a7624d7b977cc40f0730034b93 (Supabase Preview Beta success) and Phase 2 #307 merged at 98d9558 (Vercel https://beta.give.vn success).
docs(changelog): sync CHANGELOG.md for Wave 2 (#273, #77, #291, #308, #…
Merge pull request #312 from DOS/dev
JOY commentedon Nov 22, 2026
done: session=83b36fa6-8c08-49d6-aeec-63bab02a5e52 agent=antigravity
Promoted to Production (2026-11-22):