You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
{{ message }}
Repository navigation
Monthly donations A, app: sign-up, plan view, stop link and crons #276
Step 1 of monthly donations (D9): the app side of plan A. Design: docs/Give-Technical-Design.md §4.3.4 (merged in #256). It depends on the DB issue for plan A.
Scope (apps/web)
An organizer toggle for monthly giving (allow_monthly), shown only when the campaign has ends_at.
Sign-up for signed-in donors: amount, day of month (1–28), reminder consent, and the anonymity warning from §2.4 (the sender's name shows on a transparent account's statement every month).
A plan view in /me/contributions with the month's QR when visible, plus edit and cancel.
Stop-link pages: GET confirms and POST cancels, with no login (RFC 8058). Add List-Unsubscribe headers on the reminder emails.
Cron routes issue-plan-donations and plan-notices (Vercel Cron, CRON_SECRET, as the other cron routes do).
The Give PR is merged into dev after the PO's second review. On beta, a signed-in donor creates a plan, gets the first month's QR, a statement import matches it, the next month's donation is issued once even when the cron retries, and closing the campaign ends the plan and sends one end notice.
checkpoint: session=b4a20457-f6f3-41a0-b5c7-2d37e59692b8 #290 ready for the PO's second review at d3c0903 (local 2410 tests, tsc/eslint/prettier clean; reviews rounds 1-2 addressed; beta check steps in the PR body). Needs DOS/DOS.Me#1824 on Beta first.
checkpoint: session=b4a20457-f6f3-41a0-b5c7-2d37e59692b8 PO second-review findings on #290 fixed at 5289901 (Production stop-link secret, stop page result check, job skips a failing plan, plan note wording). Local 2415 tests, tsc/eslint/prettier clean.
checkpoint: session=b4a20457-f6f3-41a0-b5c7-2d37e59692b8 PO second review changes on #290 pushed at 463f0fc (jobs count DB-isolated failures, transfer button needs a usable account). 2415 tests, tsc/eslint/prettier clean.
checkpoint: session=83b36fa6-8c08-49d6-aeec-63bab02a5e52 Antigravity PO taking over while Claude PO is quota-limited (JOY 2026-11-22). Promoted to Production via #301 (main d2df5d8, Vercel Production https://give.vn success; /api/cron/issue-plan-donations returns 401 unauth). Kept open pending live/beta plan A verification checklist.
Activity
JOY commentedon Nov 20, 2026
claim: executor="Claude Code" session=b4a20457-f6f3-41a0-b5c7-2d37e59692b8 scope="apps/web monthly plans: campaign toggle, sign-up, /me/contributions plan view, stop-link pages, cron routes, email copy" branch=claude/276-monthly-plans target=2026-11-24
JOY commentedon Nov 20, 2026
checkpoint: session=b4a20457-f6f3-41a0-b5c7-2d37e59692b8 Give PR opened: #290 (head b5639a8), against dev; needs DOS/DOS.Me#1824. Local: 158 files / 2405 tests, tsc, eslint, prettier clean. Next: fresh-context review, then PO second review.
fix(monthly): one deadline per plan cron run; never show a past month…
test(monthly): route test for the plan-notices shared deadline; resto…
JOY commentedon Nov 20, 2026
checkpoint: session=b4a20457-f6f3-41a0-b5c7-2d37e59692b8 #290 ready for the PO's second review at d3c0903 (local 2410 tests, tsc/eslint/prettier clean; reviews rounds 1-2 addressed; beta check steps in the PR body). Needs DOS/DOS.Me#1824 on Beta first.
fix(monthly): PO review of #290: Production stop-link secret, stop pa…
JOY commentedon Nov 20, 2026
checkpoint: session=b4a20457-f6f3-41a0-b5c7-2d37e59692b8 PO second-review findings on #290 fixed at 5289901 (Production stop-link secret, stop page result check, job skips a failing plan, plan note wording). Local 2415 tests, tsc/eslint/prettier clean.
fix(monthly): PO review: plan jobs count failed plans; offer a transf…
JOY commentedon Nov 20, 2026
checkpoint: session=b4a20457-f6f3-41a0-b5c7-2d37e59692b8 PO second review changes on #290 pushed at 463f0fc (jobs count DB-isolated failures, transfer button needs a usable account). 2415 tests, tsc/eslint/prettier clean.
feat(monthly): monthly donations plan A: sign-up, plan view, stop lin…
Merge pull request #301 from DOS/dev
JOY commentedon Nov 22, 2026
checkpoint: session=83b36fa6-8c08-49d6-aeec-63bab02a5e52 Antigravity PO taking over while Claude PO is quota-limited (JOY 2026-11-22). Promoted to Production via #301 (main d2df5d8, Vercel Production https://give.vn success; /api/cron/issue-plan-donations returns 401 unauth). Kept open pending live/beta plan A verification checklist.